Heritage Risk Starts at Exploration, Not Construction

Most mining projects treat cultural heritage as a construction phase problem. The impact assessment is done, the management plan is written, and the chance find procedure sits in a folder until the excavators arrive. By then the most dangerous phase has already passed.

Exploration is boots on the ground in places no assessment has yet reached. Sampling, trenching, drilling, pad and access road clearance, camp construction: every one of these disturbs ground that has never been looked at, often before anyone has asked the communities who live there what it holds. The intangible dimension is the easiest to miss and the most costly to get wrong. A stream, a grove, a single tree or a rock can carry cultural or spiritual value that is invisible to a geologist and absent from every map.

On a financed project, heritage that surfaces late shows up as delay, suspended disbursement, or a grievance that will not close. Caught early, it is cheap to manage. Caught late, it can stop the work.

I have set out what good looks like, the scoping before the field season, the chance find procedures trained into the whole team, and the heritage data your own boreholes already hold, in the full article:

Read it here: https://www.culturalheritageriskmanagement.com/insights-exploration

Neil Fairburn, Director, Cultural Heritage Risk Management Ltd

★
★
★
★
★
Votes: 0
E-mail me when people leave their comments –

Neil Fairburn is Director of Cultural Heritage Risk Management Ltd. He manages cultural heritage as a governed risk across mining, exploration and major infrastructure, aligned to lender and ESG standards including IFC PS8, EBRD ESR 8, ICMM and the Equator Principles.

You need to be a member of Mining Industry Professionals to add comments!

Join Mining Industry Professionals

Blog Topics by Tags

  • ag (139)
  • au (137)

Monthly Archives