+50 Mill ROI in 12 months. Mine Production.

+50 Mill ROI in 12 months.  Mine Production.

Hi All,

I have my CEO coming to Australia in late October and then to India to present on a numbe of topics in and around the following areas.

• Production OEE, Theory of Constraints and Asset Utilization.
• Asset Performance
• Predictive Maintenance
• Defect Elimination
• Equipment Downtime
• Asset Health, Reliability and Availability
• Metallurgical Accounting

I have a case study which is attached and outlines a +50 Million dollar ROI within the first 12 months using the Optimum System, if you are interested to know more or would like to be appart of a presentation in Perth Australia late October 2019 or you are a company in India or New Zealand or PNG and would like to know more please make contact with me.

 

It seems the case study will not attach, please PM me if you are interested to know more.

 

Votes: 0
E-mail me when people leave their comments –

You need to be a member of Mining Industry Professionals to add comments!

Join Mining Industry Professionals

Blog Topics by Tags

  • ag (130)
  • au (128)
  • cu (117)
  • zn (116)
  • pb (116)

Monthly Archives